A hybrid algorithm for flexible job shop scheduling with an assembly stage
Parviz Fattahi - Naeeme Bagheri Rad - Fatemeh Daneshamooz
Parviz Fattahi - Naeeme Bagheri Rad - Fatemeh Daneshamooz
Associate Professor, Department of Industrial Engineering, Bu-Ali Sina University, Hamedan, Iran - Msc Student of Industrial Engineering, Bu-Ali Sina University, Hamedan, Iran - PhD Student of Industrial Engineering, Bu-Ali Sina University, Hamedan, Iran
زبان مقاله : انگلیسی |
تعداد صفحات مقاله : 2 صفحه |
نوع مقاله : مقاله پوستری |
ISC کد مقاله در : ISC1080_345149
چکیده
In this paper, flexible job shop scheduling problem (FJSP) with an assembly stage is studied. This problem consist of two-stage. At first, the parts are produced in a flexible job shop and then they are assembled in an assembly stage to produce products. problem has been proved strongly NP-hard, so in order to solve it, proposes a hybrid particle swarm optimization with parallel variable neighborhood (HPSOPVNS) algorithm that solves the FJSP to minimize makespan time.کليدواژه ها
Flexible job shop scheduling; Assembly; Particle swarm optimization; Parallel variable neighborhood searchنحوه استناد به مقاله
در صورتی که می خواهید در اثر پژوهشی خود به این مقاله ارجاع دهید، به سادگی می توانید از عبارت زیر در بخش منابع و مراجع استفاده نمایید:Fattahi , Parviz , 1394 , A hybrid algorithm for flexible job shop scheduling with an assembly stage , دوازدهمین کنفرانس بین المللی مهندسی صنایع
انتشار دهنده
محل انتشار : دوازدهمین کنفرانس بین المللی مهندسی صنایعمشخصات برگزارکننده همایش : دانشگاه خوارزمی و انجمن مهندسی صنایع ایران
تعداد مقالات : 534
کد اختصاصی :
۹۴۱۵۰-۶۲۳۰۲
a>
دیگر مقالات این رویداد
© کلیه حقوق متعلق به موسسه استنادی و پایش علم و فناوری جهان اسلام (ISC) می باشد.